The Marlin Spike event consists of a four (4) member team per unit. This competition consists of one (1) member putting an eye splice in one of the lines provided. A second member must put a giffy whip on the other end. The remaining two (2) members must tie three (3) lines together using square knots. The new line will then be used and heaved over an “H” frame structure. A timber hitch will be used on a log, which will be hoisted up to the top of the frame. Using a clove hitch, the opposite end of the line will be secured to a post. Points will be awarded to the unit for both time and accuracy.

Those with questions about the Marlin Spike may contact Sid Kientiz, event
judge, at (715) 923-6563.